Moore Road is a short county road off Pine Grove Road in Ringgold. It runs about 700 feet southeast before it appears to dead-end, and its pavement averages about 19 feet wide. An engineering firm hired to study the road found distress in multiple areas along it. On October 20, the Catoosa County Board of Commissioners unanimously approved the developer's plan to widen it, extend it into a planned 90-lot subdivision called Wynbrook, and add a deceleration lane on Pine Grove Road, with the developer doing the work at its own cost.
Wynbrook is one of the subdivisions that will shape what new construction in Ringgold looks like over the next few years, and this fall it is still at the road stage. For a buyer who wants a new home in Ringgold at an entry-level price, the timing of projects like this one matters more than any single listing.
The starter-priced communities are at their last homes
Smith Douglas Homes built the two most recent entry-level communities in Ringgold. As of this month, both are effectively finished.
| Community | Location | Homesites | Home sizes | Status |
|---|---|---|---|---|
| Hillcrest Park | 100 Three Notch Road | 49 | 1,214 to 2,237 sq. ft. | Final homes, 47 sold |
| Hawks View | 733 Graysville Road | 48 | 1,650 to 2,565 sq. ft. | Sold out |
Hillcrest Park's plans start at $242,900. Its one remaining inventory home is listed at $249,990, and the model is listed at $324,990, according to the builder's community page this month. The builder marks Hawks View sold out. Hillcrest Park is the only Ringgold community Smith Douglas still lists as having homes for sale.
The county already counts this kind of house as a need. The 2026 to 2030 comprehensive plan covering Catoosa County, Fort Oglethorpe and Ringgold was adopted in December 2025. It lists housing availability and cost as challenges, and it names starter homes and available building land among the housing options the area needs. In the same plan's community survey, 19% of respondents chose "too much development" as their most significant issue. Both views are part of the plan, and both affect how quickly new subdivisions move from an approved map to finished houses.
The next subdivisions are still at the road stage
Three subdivisions came before Catoosa County this year, and all three were at an early stage. In date order, the county's records show this:
- December 15, 2020: The Board of Commissioners approves Case 1338-20 for the Gentry Road Subdivision. The subdivision sits along Gentry Road between Graysville Road and the Tennessee state line.
- August 4, 2026: The board approves the developer's plan to widen Gentry Road, submitted by BB&R Vineyards, LLC, on a 4-0-1 vote with one commissioner recused.
- September 22, 2026: The Planning Commission agenda includes a preliminary plat review for Vineyards Phase VIII, a planned unit development on Swanson Road, as Case 1683-26.
- October 20, 2026: The board approves the Moore Road improvements for Wynbrook.
Gentry Road went from its county approval in December 2020 to an approved road plan in August 2026, more than five and a half years. Gentry Road and Moore Road both started out about 19 feet wide, and in both cases the developer is widening an existing county road before any homes go up.
For a buyer, that timeline works as a forecast. The new subdivisions Ringgold sees over the next few years are the ones on this list, and they are working through roads and plats now. A new wave of starter-priced homes is unlikely to appear all at once.
What Wynbrook will look like on the ground
Pratt Homebuilders is the developer named on the Wynbrook site plan, and RaganSmith is the designer. The plan shows 90 lots across about 64 acres, with typical lot dimensions of 60 by 125 feet. It combines three parcels: 52.94 acres at 396 Pine Grove Road with 70 lots, 10.14 acres at 0 Pine Grove Road with 18 lots, and 1.01 acres at 115 Moore Road with 2 lots. The layout also shows a proposed amenity area, three ponds and several wetland areas.
A 60-by-125 lot is about 7,500 square feet, a little over a sixth of an acre. That is a compact, suburban-scale homesite with room for a house and a yard, and it suits a buyer who wants a newer house more than open land.
Pratt's nearest community now selling is Fields at Huntley Meadows, which has a Rossville address near the state line. The builder advertises three- and four-bedroom homes there starting in the high $300s. One home on that page, at 440 Winchester Drive in Fort Oglethorpe, is listed at $435,000 for 2,234 square feet. That is Pratt's current product in this part of North Georgia, and it starts well above where Hillcrest Park started.
For anyone who has built on a rural site, the October vote is about the work that comes before anyone frames a wall. The geotechnical report in the county packet says the most thorough fix for Moore Road would be to remove the existing pavement completely, replace it with a new pavement section, and proofroll the subgrade with a loaded tandem-axle dump truck. Road widening, deceleration lanes and guardrail replacement all come before the first house. The October approval covered that road work, not home sales.
Ringgold also grows one family parcel at a time
Not every new house in Catoosa County comes from a builder's subdivision. The same October 20 meeting approved two rezonings for possible family divisions of land. One covers 4.54 acres at 175 Ladybug Lane in Case 1679-26. The other covers 34.18 combined acres at 2909 and 2911 Swanson Road in Case 1680-26. In February, commissioners approved rezoning about one acre on Blevins Drive for three to four proposed single-family homes on a 4-1 vote. They also unanimously approved rezoning 2.93 acres at 1599 Davis Ridge Road for three single-family homes.
Cases this small never become a sales center or a model home. They produce a few new houses on existing roads. They are also where a buyer who wants new construction in Ringgold, and who doesn't want a 60-foot lot, is most likely to find it. Building on one lot puts site work, utilities, driveway grading and foundation choices on the buyer's own budget instead of a developer's. Those costs vary much more from one rural lot to the next than they do across a platted subdivision.
What this means for a Ringgold buyer this winter
If you want a new home in Ringgold near Hillcrest Park's starting price, the options are the community's last homes and nothing else. Smith Douglas currently shows one inventory home and one model there. After those sell, a starter-priced buyer is comparing resale homes, where condition and the age of systems decide value, against the subdivisions still moving through roads and plats.
If you can wait, the county records show which roads are next: Moore Road off Pine Grove Road, Gentry Road toward the state line, and Swanson Road, where Vineyards Phase VIII was on the September agenda. Each of these subdivisions has its own schedule. The first homes depend on each developer finishing road work and recording final plats.
If you want land, the family-division cases and small rezonings like Blevins Drive and Davis Ridge Road show that Catoosa County still adds homes a few lots at a time. That path takes a contractor's eye before an offer, because the cheapest lot to buy is not always the cheapest one to build on.
Questions Ringgold buyers ask about new construction
Is Wynbrook selling homes yet? The October 20 approval covered the Moore Road improvements tied to the subdivision. It was not a sales launch. The county's minutes describe Wynbrook as a planned subdivision.
Where can I check a subdivision's status myself? Catoosa County posts Board of Commissioners and Planning Commission agendas and minutes, which list cases by number and road name. The subdivision dates in this post come from those records.
Is a resale home or a new build the better value in Ringgold right now? It depends on the specific house. A well-kept resale home with updated systems can beat a new home on a smaller lot, and a resale home with deferred maintenance can cost more than its price suggests. Our buyer resources and Ringgold neighborhood page are good places to start comparing.
If you are weighing Hillcrest Park's last homes against a resale house or a lot off a county road, Trish Savage can walk the property with you. Billy Rench, a licensed general contractor on our team, can show you what the site work, foundation and finish quality will mean before you commit. Contact Us to set up a time.